traffic-route works
| 1.BAB A 4 | |
| Place: | section of line AD Dresden-AD Nossen, VE 353.1, planning section 3, service-km 31.5 bis 23.6 |
| Masses: | 200.000 m² (27,0 cm mighty) |
| Customer: | DEGES, Berlin |
| 2. BAB A 13 | |
| Place: | Ruhländer-Heide |
| Masses: | 117.000 m² (27,0 cm mighty) |
| Customer: | ABA Brandenburg |
| 3.BAB A 14 | |
| Place: | BA 9 |
| Masses: | 57.000 m² (27,0 cm mighty) |
| Customer: | ABA Sachsen |
| 4.BAB A 14 | |
| Place: | BA 11 |
| Masses: | 32.000 m² (27,0 cm mighty) |
| Customer: | ABA Sachsen |
| 5.parking area east Munich airport | |
| Place: | munich airport at Erding |
| Masses: | 460.000 m² (40,0 cm and 36,0 cm mighty) |
| Customer: | Flughafen München Gesellschaft |
| 6. BAB A 9 | |
| Place: | AS Hermsdorf Süd - Triptis (Thüringen) |
| Masses: | 160.000 m² (30,0 cm mighty) |
| Customer: | DEGES, Berlin |
| 7.BAB A 92 | |
| Place: | AK Neufahrn - Munich airport |
| Masses: | 140.000 m² (26,0 cm mighty) |
| Customer: | Autobahndirektion Maisach |
| 8.BAB A 14 | |
| Place: | Rheintalautobahn, Ambergtunnel east tube |
| Masses: | according to RVS 8S.06.32 at least 22cm: 21.800m² |
| Customer: | Amt der Vorarlberger Landesregierung im Auftrag der ASFINAG |
| 9.Tunnel Steinhaus | |
| Place: | Semmering (Österreich) |
| Masses: | 28.000 m² ( 22,0 cm mighty) with washed concrete structure |
| Customer: | ARGE Tunnel Steinhaus Bilfinger + Berger Bau GmbH, Wien |
| 10.BAB A 24 | |
| Place: | Between AK Hamburg-Ost and L-Gr SH/MV (Gudow) |
| Masses: | 147.000 m² |
| Customer: | Straßenbauamt Lübeck |
| 11.BAB A 27 | |
| Place: | Rifa Walsrode |
| Masses: | 120.000 m² |
| Customer: | Amt für Straßen u. Verkehr, Bremen |

