waterworks
 


1.Carrying out as company Reinhold Meister GmbH

1.1 Oder-Havel-Canal


Place:Eberswalde (at Berlin)
Type:Dredging during running shipping-traffic
Goal:Construction of the passing bay Eberswalde
Customer:WSA Eberswalde
Peculiarity:Sealing with bentonite mat; integration underwater




1.2 Danube development (4 Buildinglots)


Place:Retaining weir Straubing ca. Do-km 2324,0 - 2350,0
Type:

-Earthworks completely about 5,2 Mio. m³

-Dredging works about 0,7 Mio.m³

-Petrification works about 0,25 Mio. m³

Goal:Construction of a damming-up area as a part of the Danube development
Customer:Federal Republic of Germany represented by Rhein.Main-Donau AG München
Peculiarity:Use of surplus material




1.3 Excavation of retaining capacity


Place:Bertoldsheim (at Neuburg a.d. Donau) Donau-km 2492,20 - 2494,60
Type:Excavations about 260.000,00 m³
Goal:Creation of retaining capacity
Customer:Bayernwerk Wasserkraft AG
Peculiarity:Transport of the floating appliances over land, sectional




1.4 East- and Westport


Place:Regensburg Do-km 2373,100 bis 2377,150
Type:

-Dredging with rock-cutting about 200.000,00 m³

-Petrification works about 40.000,00 m³

Goal:Bottom- dredgings, bank development, couple place, berths in the course of the Danube development
Customer:FRG, represented by Rhein-Main-Donau AG München






1.5 Floodprotection


Place:Danube embankments between Regensburg/Straubing/Deggendorf
Type:-Earthworks about 0,6 Mio. m³

-Pipeline construction about 1.000,00 m

Goal: Flood protection
Customer:FRG, represented by WWA Deggendorf
Peculiarity:Logistics gravelwithdrawal and disposition




1.6 Bed pitching Danube


Place:Osterhofen Donau - km 2271,0 - 2272,0
Type:

-Dredging works and bed pitching for the construction of a standard cross section with transport of material off shore for about 30 km of about 100.000,00 m³

-Petrification of the trench in Danube bottom = bed pitching d = 60 cm

(accuracy of pitching ± 20 cm) about 25.000,00 m³ 

Goal:Natural experiment within the scope of the Danube development for the testing of the feasability of the so called "close-to-nature Danube development" without barrage weirs only by bed pitching of the Danube bottom with stones especially for hydraulic constructions
Customer: Bundesrepublik Deutschland, represented by Wasserschiffahrtsdirektion Würzburg und RMD München
Peculiarity:Measure out of the known waterworks




1.7 Danube development


Place:Vilshofen/Bürgenfeld Do - km 2246,0 - 2252,0
Type:

-dredging works with rock cutting about 200.000,00m³

-petrification works about100.000,00m³

Goal:removal of the throat Danube/Bürgenfeld by bottom deepening
Customer:Bundesrepublik Deutschland represented by Wasserschiffahrtsdirektion Würzburg und RMD München
Peculiarity:Rock(granite) cutting without blasting, biggest hydraulic hammer used in BRD




1.8 shipping channel dredging


Place:German Danube (different building lots)
Type/Goal:maintenance dredgings
Customer:WSA Regensburg




1.9 Main-Donau-Canal


Place:between Hilpoldstein (=crest keeping) and Kelheim(=flow into Danube)
Type/Goal:

construction of a canal bed/waterway with in the middle 150-200 m width

a) in open country without river

b) in the Sulzvalley

c) in the Altmühlvalley from Dietfurt to Kelheim

Extent:

altogether ca. 40 km canalstretch with about 30 Mio.m³ earth movement

Costumer:Rhein-Main-Donau AG as representative of the FRG
Peculiarity:maximum performance in earth- and waterworks (daily performance earthworks: up to 28.000 m³) with view to the close to nature interests




1.10 maintenance dredgings


Place:city of Ulm
Type/Goal:storage capacity dregings of about 600.000 to
customer:municipality of Ulm




1.11 Development of the river Main


Place: damming-up Steinbach Lot J3
type:

-dredging works (gravel and rock) with material transport about 350.000,00 m³

-petrification works about 50.000,00 m³

Goal:

deepening of the bottom of the Main

bank development

Customer:WNA Aschaffenburg
Peculiarity:transport logistics only over about 70 km waterway possible




1.12 Mittellandcanal


Place:at Wolfsburg
Type:

-earthmovement: 900.000 m³

-sheet pile works: 90.000 m²

-petrification: 83.000 m²

-geotextile filter: 90.000 m²

Customer:WNA Helmstedt
Peculiarity:pile driving and pressing works on-shore and off-shore as own performance with LRB 1500 and running ship-traffic




1.13 berth Rühen


Place:Rühen
Type:dredging
Costumer:WNA Helmstedt
Peculiarity:dewatering of the excavated soil before driving away on public roads




1.14 reconstruction Lechcanal


Place:at Gersthofen
measure:reconstruction of the Lechcanal at Gersthofen ca. 100.000 m² constructing of canal slopes and -bottoms, carrying out of the necessary earthworks, integration of gravel material and geotextile woven filter medium.
customer:LEW Augsburg
Peculiarity:date starting-up power station; fine shaping and compression of up to 20 m broad dam embankments




1.15 reconstruction of the middle Isarcanal


customer:Bayernwerk Wasserkraft AG, Landshut
Peculiarity: complete redevelopment of a ca. 4.0 km barrage zone of the Isarcanal in very short construction time




1.16 development Dortmund-Ems-Canal


Place:development track line Amelsbüren
Type:cross-section development of the Dortmund-Ems-Canal incl. Große-Beckmann-siphon and bridge over the Emmerbach
Customer: Wasser- und Schiffahrtsverwaltung des Bundes, represented by Wasserstraßen-Neubauamt Datteln
Peculiarity:pile-driving works with predrilling as own performance




1.17 Inn development


customer:Innwerke Töging und Bayrische Wasserkraftwerke, Landshut
length:30 km
masses:1.700.000 m³ coarse gravel

2. Carrying out in contract combine

2.1 development of the Saar


place:Hostenbach/Luisenthal a.d. Saar
type of performance:deepening and widening of the Saar
goal:improvement of the shipping conditions
customer:Wasser- und Schiffahrtsamt Saarbrücken
peculiarity:use of grandhydraulicexcavator Liebherr 994 in the water




2.2 Danubeharbour Straubing


Place:harbour Straubing- Sand
Art:earthexcavating and dredging works of the excavation of the harbour basin of about 500.000,00 m³
Goal:Construction of the harbour basin with connection to the danube
customer:Zweckverband Donauhafen Straubing




2.3 Isardevelopment


Place:barage dam with power station Pielweichs (at Plattling)
Type:

-earth excavating and dredging works about 8 Mio.m³

-petrification works about 0,5 Mio. to

-slope protection with woven filter medium about 0,5 Mio.m²

-pipeline construction about 30 km

Goal:prevention of developing deepening of the Isar bottom by retaining connection of a power station
Customer:Freistaat Bayern und Bayer. Wasserkraft AG, vertreten durch WWA Landshut

3. waterworks construction sites in austria

3.1 dredging ford Schwallenbach and ford Hofarnsdorf


goal:Construction of the Danube bottom as planned by gravel dredging
masses:ca. 75.000 m³
customer:WSA Wien




3.2 dredging of 4 fords between Vienna and Hainburg


Goal:construction of a bottom as planned by gravel dredging
Masses:ca. 67.000 m³
Construction:WSA Wien




3.3 Regulation Schwalbeninsel


Goal:Construction of regulation buildings
customer:WSA Wien




3.4 rock clearance Pyburg


Goal: Construction of a bottom by rock clearance
Customer:WSA Wien




3.5 measure Krems/Wien


Goal:

gravel withdrawal out of retaining area, transport ca. 100 km

gravel addition in Donau at Wien

masses:ca. 1.500.000 to
customer:Austrian Hydro Power
Peculiarity:logistics only with own shoving-units




3.6 reconstruction of erosional cavity in the barrage underwater at 4 power stations


Goal:

profiled integration of gravel/breakage rubble/stones for waterworks

ca. 100.000 to

integration depth up to 14 m

Customer:Austrian Hydro Power

 
 