| 1.BAB A 96 Munich Lindau | |
| Place: | Leutkirch, construction-km 36,0 bis construction-km 46,0 |
| Type: | earthmovement: ca. 2.000.000 m³ asphalt works: ca. 250.000 m² |
| Goal: | detour of the city of Leutkirch |
| customer: | Autobahnbetriebsamt Heidenheim, BL Wangen |
| 2. BAB A 8/ East Munich-Salzburg | |
| Place: | Chiemsee, lot SaU 11 bl km 85,000 - 88,040 |
| Type: | additional construction of an emergency lane improvement of the BAB drainage |
| Customer: | ABD Southbavaria, Munich |
| 3.BAB A 8/West Munich-Stuttgart | |
| Place: | km 7,442 to km 10,030 |
| Type: | works for additional construction to 6 lanes |
| Customer: | ABD Südbayern, München |
| 4.BAB A 8/West Munich-Stuttgart | |
| Place: | Dachau/Fürstenfeldbruck, km 10,375 to km 11,943 |
| Type: | additional construction to 6 lanes with adaption of points of access Dachau/Fürstenfeldbruck, as well as the federal highway 471 in the crossing area of the BAB at km 17,756 |
| Customer: | ABD Südbayern, München |
| 5.new building of the stretch at Neufahrn | |
| Place: | Neufahrn, km 31,00 to km 38,500, West opening-up, construction stage 1 bis 4 |
| Type: | earth- and drainage works in the course of the new construction of a double-track Neufahrn - airport Munich |
| Customer: | Deutsche Bahn AG, München (Heilit+Woerner, München/Walter Bau, München) |
| 6.BAB A 9 | |
| Place: | AS Hermsdorf Süd - Triptis (Thüringen) |
| Type: | frost protection: 100.000 m³ earth workings: 250.000 m³ asphalt paving: 5.000 to |
| Customer: | DEGES, Berlin |
| 7.BAB A 92 | |
| Place: | AK Neufahrn - airport munich |
| Art: | frost protection: 145.000 m² earth workings: 160.000 m³ concrete demolition 17.500 m³ hydrulic bound pavement base: 140.000 m² |
| Customer: | Autobahndirektion Maisach |
| 8.BAB A 9 Berlin-Nürnberg | |
| Place: | AS Hof- AS Müncheberg/Nord Los A 9 / EO 260 |
| Type: | earth and drainage workings |
| Customer: | ABD Nordbayern, Nürnberg |
| 9.BAB A 9, Berlin-Nürnberg | |
| Place: | base of the Bindlacher mountain - AS Bayreuth/Nord lot A 9 / EO 300, km 299,1 to km 303,0 |
| Type: | additional construction to 6 lanes |
| Customer: | ABD Nordbayern, Nürnberg |
| 10.BAB A 4 Dresden-Nossen | |
| Ort: | AD Dresden - AD Nossen, VE 353.1, planning section 3, service-km 31.5 to 23.6 |
| Type: | construction of track line and bridges |
| Customer: | DEGES, Berlin |
| 11.New building Lausitz Ring | |
| Place: | Lausitz |
| Type: | VE 03 - test- und racing-track (ovoid) and various road and drainage workings |
| Customer: | Förderverein Lausitzring, Klettwitz |
| 12. AMD-Dresden | |
| Place: | Dresden |
| Art: | development of a ca. 15 ha large area for a chip plant; earth movement: ca. 250.000 m³ pipelines DN 300 to DN 1000: ca. 20.000 lfm. complete deep workings for supply and disposal with external features and traffic areas ca 25.000 m² paved areas(asphalt- and concrete building method) |
| Customer: | Meissner + Wurst, Stuttgart (now M+W Zander) |
| 13.BAB A 13 Ruhländer - Heide | |
| Place: | Lausitz |
| Type: | concrte pavement removal: 90.000 m² soil improvement: 120.000 m² earth workings: 60.000 m³ |
| Customer: | ABA Brandenburg |
| 14.BAB A 14 | |
| Place: | BA 9 |
| Type: | concrete pavement removal: 10.700 m² soil improvement: 32.000 m² earth workings: 16.000 m³ asphalt paving: 25.500 to |
| Customer: | ABA Sachsen |
| 15.BAB A 14 | |
| Place: | BA 11 |
| Type: | concrete pavement removal: 19.000 m² frost protection: 12.000 m² earth workings: 15.000 m³ asphalt paving: 14.000 m³ also drainage workings on a large scale. |
| Customer: | ABA Sachsen |
| 16.BAB A 93 | |
| Place: | lot 25 and lot 26 |
| Type: | frost protection: 210.000 m³ earth workings: 1.900.000 m³ asphalt paving: 60.000 m³ also drainage works in a large scale |
| Customer: | ABA Sachsen |
| 17.Parking area East Munich airport | |
| Place: | Munich airport at Erding |
| Type: | frost protection: 150.000 m³ earth workings: 200.000 m³ asphalt paving: 25.000 to also drainage works. |
| Customer: | Flughafen München Gesellschaft |
18.BAB A 9 | |
| Place: | AS Hermsdorf Süd - Triptis (Thüringen) |
| Type: | frost protection: 100.000 m³ earth workings: 250.000 m³ asphalt paving: 5.000 to also drainage workings and construction of retaining walls and bridges. |
| Customer: | DEGES, Berlin |
| 19.Development of an industrial area | |
| Place: | Thyrnau |
| Type: | ca. 800.000 m³ soil easing and reintegration, besides carying out of drainage works |
| Customer: | Gemeinde Thyrnau, Lkr. Passau |
| 20.BMW Leipzig preparation of construction field | |
| Place: | Leipzig |
| Type: | topsoil: 750.000 m³ earthworks: 3.060.000 m³ hydraulic bonding material: 100.000 to earthexcavation for pipeline trenches: 80.000 m³ earthexcavation for trenches: 95.000 m³ filter drains DN 200/300: 52.000 lfm earth workings for retention basin: 220.000 m³ |
| Customer: | GVZ Nord Plant |
| Peculiarity: | Construction time: October 2001 to May 2002; daily performance of earthworks: up to 60.000 m³ |
| 21.BAB A 27 | |
| Place: | Rifa Walsrode, km 78,6+00 to km 70,7+00 |
| Type: | earth- and roadworks, as well as drainage and construction of bridges in the course of the additional construction to 6 lanes |
| Customer: | Amt für Straßen und Verkehr, Bremen |
| 22.BAB A 24 | |
| Place: | between AK Hamburg-Ost und L-Gr SH/MV(Gudow) |
| Type: | removal and recycling of the existing concrete pavement: 130.000 m³ unbound pavement base of recycled pavement base Tragschicht: 24.000 m² construction of strengthening of recycled old concrete pavement: 150.000 m² |
| Customer: | Straßenbauamt Lübeck |
| Peculiarity: | complete structural change of the roadways of both directions within 7 months |
earth works and deep workings
Reinhold Meister GmbH, Donaustr. 2, 94491 Hengersberg, Tel. 09901 9310-0, Fax 1243, Email